Structural Engineer Reports
Excavation dug beneath the old brick footing of a house, with steel reinforcing bars standing in the pit and a tape measure across the top

Homeowners · Builders · Contractors

Underpinning design, permit documentation and certification

When the investigation shows underpinning is needed, a structural engineer designs it to suit the cause and your soil, prepares the documents for the building permit or approval, inspects the critical stages and certifies the finished work. Any licensed contractor can build it. We never sell or carry out the work.

  • Engineer's design
  • Permit documents
  • Stage inspections & sign-off

Fixed price before we start

Quote my underpinning design

Reply within 1–2 business hours. No obligation.

Fixed quote for your job. Prefer to talk? 07 2150 0579

Signed by structural engineersEngineers Australia · RPEQ
Fixed quote in 1–2 business hoursMon–Fri: 8:00am – 5:00pm
Fixed quote for each designPrice fixed before we start
IndependentWe never sell or carry out repairs

Overview

What does a structural engineer do for underpinning?

The short answer

A structural engineer for underpinning confirms why the footings moved, decides whether underpinning is the right fix and, if it is, designs it: the method, extent, founding depth and details. The engineer prepares the documents for the building permit or approval, inspects critical stages during the work and certifies that it was built to the design.

That's a different job from quoting underpinning. A contractor prices and builds the work; an underpinning engineer decides what the work should be and checks it was done. Keeping the two apart means the design is set by your soil and the cause of movement, not by the method a company happens to install.

Underpinning strengthens or deepens the footings of slab or strip-footing houses, often masonry. If your house is a raised timber-floored house on stumps, the equivalent work is restumping. Our guide to underpinning vs restumping explains the difference.

Who it's for
Homeowners, builders and underpinning contractors
Cause first
Diagnosed before design, with soil or plumbing tests if needed
The design
Method, extent, founding depth and details
Permit
Documents for the building permit or approval
During the work
Engineer's inspections at critical stages
Fee
Fixed quote per job, within 1–2 business hours
Footing drawings spread on a desk with a red pen and a scale rulerDESIGN · FOR PERMIT

Key takeaways

  • Cause first: the diagnosis decides whether underpinning is needed at all.
  • One independent design lets every contractor quote the same scope.
  • Any licensed contractor can build it, and we inspect and certify it.
  • Documents prepared for your building surveyor or certifier.

How it works

How does underpinning design and certification work?

Six steps from the first inspection to the final certificate: inspect, diagnose, design, permit, stage inspections, certify. Steps five and six happen while your contractor builds.

  1. Step 1 · On site

    Inspect

    Cracks measured and rated against the AS 2870 damage categories; doors, windows, floors, drainage, trees and site conditions checked.

  2. Step 2 · Diagnosis

    Diagnose the cause

    Why the footings moved, sometimes confirmed by a geotechnical soil investigation or a plumbing test. If underpinning isn't the right fix, we say so here.

  3. Step 3 · Design

    Design the underpinning

    Method, extent, founding depth and details, chosen for the soil and the cause.

  4. Step 4 · Before work starts

    Document for the permit

    Drawings and documents for the building permit or approval, through your building surveyor or certifier.

  5. Step 5 · During the work

    Inspect critical stages

    Excavations and other critical stages checked against the design before they're covered up.

  6. Step 6 · On completion

    Certify

    A certificate that the work was built to the design, for you and your building surveyor or certifier.

Excavated pit beside a house with a concrete pad cast under the existing footing
Figure 1A concrete pad cast under an existing footing. Stage inspections happen while work like this can still be seen, so depth and ground can be checked against the design.

Already have a contractor's quote?

Before you commit, an underpinning quote review from $390 + GST checks the cause, method and scope. If the work goes ahead, an independent design lets any contractor price the same drawings.

Quote my underpinning design

Methods

Concrete, screw piles or resin: which underpinning method is right?

The one that suits your soil, the cause of movement, the depth to firmer ground and the house. None suits every house, which is why we design the method rather than sell one.

Three common underpinning methods, side by side

Mass concrete underpinning, screw piles and resin injection compared Three simplified sections of a wall on a strip footing. In the first, a concrete block is cast under the footing down to firmer ground. In the second, a steel screw pile beside the footing reaches firmer ground and is connected to the footing with a bracket. In the third, resin is injected through small tubes into the soil under the footing. firmer ground firmer ground firmer ground 1 · Mass concrete 2 · Screw pile 3 · Resin injection
  • 1 · Mass concrete: concrete is cast in short sections under the footing, down to firmer ground.
  • 2 · Screw piles or piers: steel piles are driven or screwed to a firmer layer and tied to the footing with brackets or a new beam.
  • 3 · Resin injection: expanding resin is injected into the soil under the footing to fill voids, densify it and sometimes lift the footing.
Figure 2Simplified sections, not to scale. The right method depends on the soil, the cause of movement and the building, so the diagnosis has to come first. We design and certify; we don't sell any method.Illustrative diagram. Prepared by Structural Engineer Reports.

Mass concrete underpinning casts concrete in short sections beneath the existing footing, down to firmer ground; concrete piers take the same idea deeper. Screw pile underpinning uses steel piles screwed to a firmer layer and tied to the footing. Resin underpinning injects expanding polyurethane into the soil under the footing.

Each has its place, and each has limits. The engineer's job is to match the method to the evidence, then specify it so it can be built and checked. For a fuller comparison, read underpinning methods compared and what is underpinning?

Underpinning doesn't fix the cause

If a leak, poor drainage or a tree caused the movement, the design has to deal with that too, or the footings may keep moving somewhere else.

MethodHow it worksOften considered whenQuestions for the design
Mass concreteConcrete cast in short sections under the existing footing, down to firmer groundFirmer ground is at a depth that can practically be dug toExcavation depth, access, and the order sections are dug and poured
Concrete or bored piersConcrete piers taken down to firmer ground and connected to the footingFirmer ground is too deep to reach economically with mass concretePier depth and spacing, and the connection to the footing
Screw piles (helical piers)Steel piles screwed to a firmer layer, tied to the footing with brackets or a beamFirmer ground is deep, or there's little room to digThe layer they must reach, installation records, durability in your soil
Resin injectionExpanding polyurethane injected to fill voids, densify the soil and sometimes lift the footingVoids or loose soil under the footing are part of the problemTreatment depth, whether the cause will continue, levels before and after
Slab jackingPart of a slab lifted back towards level by injectionPart of a slab has droppedWhy it dropped, and whether it can be lifted without new cracking

General descriptions only. Each method suits different soils and causes, so the choice for your house follows the diagnosis.

For homeowners

What do homeowners get from an independent underpinning design?

If you own the house, the engineer works for you: confirming the cause, designing a repair that suits it and checking the contractor builds what was designed.

The cause, confirmed

Before anything is designed, we confirm why the house moved, and say so if underpinning isn't the answer.

A design for your house

Method, extent and founding depth chosen for your soil and your house, not a standard product.

Comparable quotes

Every contractor prices the same drawings, so you compare like with like.

Permit documents

Drawings and documents for your building surveyor or certifier.

Stage inspections

An engineer checks the critical stages while they can still be seen.

Certification

A certificate that the work was built to the design, for your records.

How much does underpinning design cost?

We fix-quote each job, because the fee depends on the extent of the work, the method and the number of stage inspections. For a sense of scale, the Melbourne Restumping cost guide puts engineering fees on underpinning jobs at $1,000–$6,000, against building costs that hipages puts at $10,000–$15,000 for a typical house (both checked October 2026).

Engineering against building costs: published ranges

  • Engineer inspections$200–$800
  • Engineering fees, underpinning jobs$1k–$6k
  • Underpinning, typical house (hipages)$10k–$15k
  • Underpinning, large jobs (QuickQuote)$25k–$50k
$0$10,000$20,000$30,000$40,000$50,000
Figure 3Published ranges, not our prices. Our fee for your job is a fixed quote. Only a site-specific quote gives a real price for the building work.Source: Melbourne Restumping cost guide (engineering); hipages; QuickQuote. Checked 8 October 2026.

The engineering is the smaller part of the cost, and the part that decides what gets built. Not sure underpinning is needed yet? Start with a foundation and crack report from $450 + GST, which is also the first step of the design. See all fees, or read our underpinning cost guide.

For contractors

Underpinning engineer for contractors

If you build underpinning, you'll usually need an engineer on the job. We provide the design, permit documents, stage inspections and certification, with a fixed quote within 1–2 business hours.

What contractors get

  • A fixed engineering quote within 1–2 business hours
  • A confirmed cause, so the job is priced on evidence
  • Designs for mass concrete, piers or screw piles, and resin where it suits
  • Documents for the building permit or approval
  • Stage inspections at the points set in the design
  • Certification on completion, for you and the owner

Our engineering judgement isn't for sale

If the investigation shows underpinning isn't needed, we'll say so, which protects your reputation too. Where your system suits the ground and the cause, we'll design with it.

Permits

Does underpinning need a building permit?

Usually, yes. Underpinning is structural work, and it usually needs a building permit or approval supported by an engineer's design. The rules differ between states and councils, so your building surveyor or certifier confirms what your job needs.

State notes

In Victoria, underpinning usually needs a building permit, and councils may also require an asset protection permit when works use the frontage. In Queensland, professional engineering services must be carried out or supervised by a Registered Professional Engineer of Queensland (RPEQ) under the Professional Engineers Act 2002 (Qld). Elsewhere, ask your building surveyor or certifier.

Wondering whether you need an engineer at all? Read do you need an engineer for underpinning?

What the design documents set out

  • The method, and why it suits the soil and the cause
  • Extent and locations: which walls and footings, and where
  • Founding depth or stratum: what the new work must reach
  • Details and notes for the contractor to build from
  • Stage inspections: the points the engineer checks

Do

  • Confirm the cause before design
  • Get quotes on the same design
  • Keep the certificate with the house's records

Don't

  • Start digging before the permit or approval
  • Backfill or pour before a stage inspection
  • Choose the method before the diagnosis

Questions

Underpinning design and certification FAQs

Still unsure? Call 07 2150 0579 and an engineer will talk it through.

What does an underpinning engineer do?
An underpinning engineer confirms why the footings moved, designs the underpinning (method, extent, founding depth and details), prepares documents for the building permit or approval, inspects critical stages and certifies the finished work.
Do I need a building permit for underpinning?
Usually, yes. Underpinning is structural work that usually needs a building permit or approval with an engineer's design. Your building surveyor or certifier confirms the requirements for your job.
Which is better: concrete underpinning, screw piles or resin?
None is best for every house. The soil, the cause of movement, the depth to firmer ground and access decide the method, so it should follow the diagnosis. Read underpinning methods compared.
Do I need a soil test before underpinning is designed?
Sometimes. If the cause can't be confirmed from the inspection, a geotechnical soil investigation or a plumbing test may be needed first. We'll tell you if one is needed, and why, before any design starts.
What are stage inspections?
Inspections by the engineer at critical points in the work, such as excavations before concrete is placed, to confirm the work matches the design before it's covered up. The design sets which stages are inspected.
Can any contractor build the design?
Yes. Any licensed contractor can build to the design, and you can get several quotes on the same drawings. We don't recommend contractors or carry out the work.
How much does underpinning design and certification cost?
We give a fixed quote for each job, because it depends on the extent, the method and the number of stage inspections. The Melbourne Restumping cost guide puts engineering fees on underpinning jobs at $1,000–$6,000 (checked October 2026).
Do you work with underpinning contractors?
Yes. We provide design, permit documents, stage inspections and certification for contractors, with a fixed quote within 1–2 business hours. See engineering for contractors.
Is underpinning the same as restumping?
No. Restumping, or reblocking, replaces the stumps of a raised timber-floored house; underpinning strengthens or deepens the footings of slab or strip-footing houses. Read underpinning vs restumping.

Before anyone quotes a repair

Find the cause before anyone quotes a repair.

Tell us what you're seeing and where. You'll have a fixed quote within 1–2 business hours, and an independent engineer's report you can act on with confidence.

Get a fixed quote Call 07 2150 0579

Inspections from $450 + GST · No obligation

Call Get a fixed quote